We took delivery of the laser today at Colab!
- The two stacked crates have been brought out to the back of the truck, but they’re too big for the truck’s lift gate! We borrowed a forklift from Ace Electric.
- The forklift carefully removes the crates from the truck, revealing for the first time the warning that extra long forks are required!
- The forklift turned around in the driveway.
- The top crate contained just this one long narrow cardboard box, very carefully packed in foam. That’s the laser tube!
- The forklift came back to move the main crate inside the building.
- Beginning to uncrate the main unit!
- Ta dah!
- The water chiller shipped separately to a FedEx location. Here it’s in the back of my car for transport.
- Here’s the water chiller in my garage awaiting installation.